{"id":11849,"date":"2026-11-08T04:08:02","date_gmt":"2026-11-08T04:08:02","guid":{"rendered":"https:\/\/dahaisolar.com\/markets\/romania\/"},"modified":"2026-11-08T05:50:59","modified_gmt":"2026-11-08T05:50:59","slug":"romania","status":"publish","type":"market","link":"https:\/\/dahaisolar.com\/ro\/markets\/romania\/","title":{"rendered":"Rom\u00e2nia"},"excerpt":{"rendered":"","protected":false},"featured_media":0,"template":"","meta":{"_acf_changed":false,"_seopress_robots_primary_cat":"","_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}}},"class_list":["post-11849","market","type-market","status-publish","hentry"],"acf":{"country_name":"Romania","country_name_source":{"label":"Country name (English)","type":"text","formatted_value":"Romania"},"iso_code":"RO","iso_code_source":{"label":"ISO country code","type":"text","formatted_value":"RO"},"region":"europe","region_source":{"label":"Region","type":"select","formatted_value":"europe"},"hero_intro":"DAHAI SOLAR S.R.L. is registered in Olteni\u021ba, Romania. Explore the company registration details, local distributor listings and the Sibiu project reference below. For product enquiries, send your model requirements, quantity and delivery location.","hero_intro_source":{"label":"Hero sentence","type":"textarea","formatted_value":"DAHAI SOLAR S.R.L. is registered in Olteni\u021ba, Romania. Explore the company registration details, local distributor listings and the Sibiu project reference below. For product enquiries, send your model requirements, quantity and delivery location."},"card_summary":"Registered company in Olteni\u021ba, local distributor listings and a 1.1 MW project reference in Sibiu.","card_summary_source":{"label":"One-line summary (market cards)","type":"text","formatted_value":"Registered company in Olteni\u021ba, local distributor listings and a 1.1 MW project reference in Sibiu."},"translated_languages":["en_US"],"translated_languages_source":{"label":"Languages with a real, reviewed translation","type":"checkbox","formatted_value":["en_US"]},"linkedin_url":"","linkedin_url_source":{"label":"LinkedIn country page URL","type":"url","formatted_value":""},"factory":{"kind":"registered_company","legal_name":"DAHAI SOLAR S.R.L.","registration_no":"J2023019679407 \u00b7 CUI 48970762","vat_no":"","address":"Bulevardul 22 Decembrie Nr. 1\nOlteni\u021ba 915400, Jude\u021bul C\u0103l\u0103ra\u0219i, Romania","city":"Olteni\u021ba","note":"Company registration details are shown here from the Romanian registration certificate.","verified":true},"factory_source":{"label":"Local legal entity \/ factory","type":"group","formatted_value":{"kind":"registered_company","legal_name":"DAHAI SOLAR S.R.L.","registration_no":"J2023019679407 \u00b7 CUI 48970762","vat_no":"","address":"Bulevardul 22 Decembrie Nr. 1\nOlteni\u021ba 915400, Jude\u021bul C\u0103l\u0103ra\u0219i, Romania","city":"Olteni\u021ba","note":"Company registration details are shown here from the Romanian registration certificate.","verified":true}},"warehouse":{"exists":false,"city":"","coverage":"","delivery":"","verified":false},"warehouse_source":{"label":"Local warehouse","type":"group","formatted_value":{"exists":false,"city":"","coverage":"","delivery":"","verified":false}},"supply":{"text":"Supply available from our verified Romania facility. Delivery arrangements are confirmed per order.","verified":false},"supply_source":{"label":"Cross-border supply note","type":"group","formatted_value":{"text":"Supply available from our verified Romania facility. Delivery arrangements are confirmed per order.","verified":false}},"office":{"address":"","contact_person":"","phone":"","whatsapp":"","email":"","languages":"Romanian, English","verified":false},"office_source":{"label":"Local office & contact","type":"group","formatted_value":{"address":"","contact_person":"","phone":"","whatsapp":"","email":"","languages":"Romanian, English","verified":false}},"distributors":[{"name":"SIMAI Technology SRL","type":"distributor","authorization":"none","region":"Romania","website":"https:\/\/ro.simaigroup.com\/dahai\/","logo":false,"products":"Solar modules, batteries","verified":true},{"name":"Alaska Energies","type":"distributor","authorization":"none","region":"Romania","website":"https:\/\/alaska-energies.ro\/","logo":false,"products":"LiFePO4 batteries","verified":true},{"name":"ASR","type":"distributor","authorization":"none","region":"Romania","website":"","logo":false,"products":"","verified":false}],"distributors_source":{"label":"Local distributors \/ installers \/ EPC partners","type":"repeater","formatted_value":[{"name":"SIMAI Technology SRL","type":"distributor","authorization":"none","region":"Romania","website":"https:\/\/ro.simaigroup.com\/dahai\/","logo":false,"products":"Solar modules, batteries","verified":true},{"name":"Alaska Energies","type":"distributor","authorization":"none","region":"Romania","website":"https:\/\/alaska-energies.ro\/","logo":false,"products":"LiFePO4 batteries","verified":true},{"name":"ASR","type":"distributor","authorization":"none","region":"Romania","website":"","logo":false,"products":"","verified":false}]},"products_available":null,"products_available_source":{"label":"Products available in this country","type":"relationship","formatted_value":null},"projects_linked":null,"projects_linked_source":{"label":"Project references (extra)","type":"relationship","formatted_value":null},"certifications":[11931],"certifications_source":{"label":"Certifications valid in this country","type":"relationship","formatted_value":[11931]},"support":{"contact":"","languages":"","process":"","verified":false},"support_source":{"label":"Technical support & after-sales","type":"group","formatted_value":{"contact":"","languages":"","process":"","verified":false}},"faqs":[{"question":"Does DAHAI SOLAR have a company in Romania?","answer":"<p>DAHAI SOLAR S.R.L. is registered under J2023019679407 (CUI 48970762), with its registered address at Bulevardul 22 Decembrie Nr. 1, Olteni\u021ba, C\u0103l\u0103ra\u0219i County, Romania.<\/p>"},{"question":"How can I buy DAHAI SOLAR products in Romania?","answer":"<p>Installers, EPC contractors and distributors can request a quote directly from this page. Selected products are also carried by Romanian distributors such as SIMAI Technology and Alaska Energies. Tell us the product type, quantity and delivery city and we confirm availability and the right contact.<\/p>"},{"question":"Which products are available for the Romanian market?","answer":"<p>Explore the solar module, inverter and energy storage product ranges. Include the model, quantity and delivery city in your enquiry so availability can be confirmed for your project.<\/p>"},{"question":"Do DAHAI SOLAR modules and inverters carry the certifications required in Romania?","answer":"<p>Request the certificate for the exact model and application. Check the certificate holder, model coverage, standard and validity against your project requirements.<\/p>"},{"question":"Is there a DAHAI SOLAR project reference in Romania?","answer":"<p>Yes. A 1.1 MW rooftop PV plant was installed at a Louis Vuitton facility in Sibiu, Romania. See the Local project references section on this page.<\/p>"},{"question":"Is DAHAI SOLAR the same company as DAH Solar?","answer":"<p>No. DAHAI SOLAR (Dongying, Shandong, China; Romanian entity DAHAI SOLAR S.R.L.) is not related to DAH Solar. Please check the brand name and the legal entity on quotations and certificates.<\/p>"},{"question":"Who do I contact for technical support in Romania?","answer":"<p>Use the Contact page and include the product model, serial number, installation country and a description of the issue.<\/p>"},{"question":"If I export surplus solar power in Romania, how will my supplier credit me, and which charges will I still pay?","answer":"<p>Law 160\/2026, in force since 26 July 2026, changed Romania's prosumer rules. Up to 200 kW per site, quantitative compensation applies until 31 December 2030 and is now settled monthly: grid electricity you use is billed at your contract's active-energy price plus all legal tariffs and taxes, and every kWh you export is bought at that energy price minus the components the law excludes. So on grid consumption you still pay transmission and distribution tariffs, system services, the cogeneration contribution, green certificates, excise and VAT. Surplus delivered from 26 July 2026 is valued in money each month instead of being carried forward in kWh for 24 months. For 200\u2013400 kW, suppliers pay the monthly weighted-average day-ahead (PZU) price. ANRE's implementing orders were still in public consultation. Checked: 8 November 2026.<\/p>"},{"question":"Which home battery subsidies are open in Romania right now, who can apply and how?","answer":"<p>The national scheme is the Programme for installing electricity storage systems, run by AFM under Ministry of Environment Order 1904\/2026, with a 400 million lei budget. It is open to individuals who already hold prosumer status, however their PV was financed. AFM covers up to 75% of the project value, capped at 15,000 lei including VAT, with an eligible-cost ceiling of 1,500 lei per kWh. Batteries need at least 10 kWh, 5,000 cycles, a BMS and automatic charging from PV surplus. Installers are validated 16\u201320 November 2026; individuals then apply online in the AFM application from 20 November (10:00) to 25 November 2026 (23:59). Projects are ranked by score, not first-come. A guide amendment entered consultation on 6 November; check afm.ro before applying. Checked: 8 November 2026.<\/p>"},{"question":"What funding is available for businesses and farms installing solar and storage in Romania (e.g. AFIR)?","answer":"<p>For farms and agri-food companies, the main scheme is AFIR's state-aid Energy Scheme for new renewable capacity for self-consumption, funded by the Modernisation Fund. Its third session ran 15 June\u201314 August 2026 and covered solar PV with or without storage; wind was dropped. The allocation was 265 million euro (145 million for up to 1 MW, 120 million above 1 MW). Aid is 100% non-refundable, up to 650,000 euro\/MW up to 1 MW or 550,000 euro\/MW above 1 MW, within 20 million euro per beneficiary. That session is closed; AFIR published the final selection report for projects above 1 MW on 3 November 2026 and said it may open a new session if funds remain. Other companies should watch Modernisation Fund calls on energie.gov.ro. Checked: 8 November 2026.<\/p>"},{"question":"What tilt and orientation work best for solar panels in Romania?","answer":"<p>Using EU JRC PVGIS 5.3 (SARAH3 data 2005\u20132023, crystalline silicon, 14% system losses, free-standing fixed mounting), the optimum is roughly due south at 36\u00b0 in Bucharest (1,298 kWh per kWp per year), 38\u00b0 in Cluj-Napoca (1,217) and 35\u00b0 in Constan\u021ba (1,313). A south-facing roof at 30\u00b0 loses less than 1%. East or west faces at 10\u00b0 give about 83\u201385% of the optimum (Bucharest: 1,093 east, 1,099 west); at 30\u00b0 about 79\u201381%. An east\u2013west layout therefore yields roughly 15\u201320% less per kWp, but spreads output into morning and evening, which can raise self-consumption. Rerun PVGIS for your exact site, roof pitch and shading. Checked: 8 November 2026.<\/p>"},{"question":"How long does a solar system take to pay back in Romania?","answer":"<p>There is no single payback figure: it depends on your tariff, self-consumption share, system cost and any grant. A transparent method: (1) estimate annual yield for your site with EU JRC PVGIS (at optimum tilt and 14% losses, about 1,217\u20131,313 kWh per kWp in Cluj-Napoca, Bucharest and Constan\u021ba); (2) split it into self-consumed and exported kWh, ideally using hourly meter data; (3) value self-consumed kWh at your full bill price, and exported kWh at your supplier's settlement price (up to 200 kW) or the monthly PZU average published by OPCOM (200\u2013400 kW); (4) payback = net cost after grants \u00f7 (annual savings \u2212 maintenance), allowing for panel degradation. Current supply offers are on ANRE's comparator at posf.ro. Checked: 8 November 2026.<\/p>"}],"faqs_source":{"label":"Local FAQ (10\u201315 questions)","type":"repeater","formatted_value":[{"question":"Does DAHAI SOLAR have a company in Romania?","answer":"<p>DAHAI SOLAR S.R.L. is registered under J2023019679407 (CUI 48970762), with its registered address at Bulevardul 22 Decembrie Nr. 1, Olteni\u021ba, C\u0103l\u0103ra\u0219i County, Romania.<\/p>\n"},{"question":"How can I buy DAHAI SOLAR products in Romania?","answer":"<p>Installers, EPC contractors and distributors can request a quote directly from this page. Selected products are also carried by Romanian distributors such as SIMAI Technology and Alaska Energies. Tell us the product type, quantity and delivery city and we confirm availability and the right contact.<\/p>\n"},{"question":"Which products are available for the Romanian market?","answer":"<p>Explore the solar module, inverter and energy storage product ranges. Include the model, quantity and delivery city in your enquiry so availability can be confirmed for your project.<\/p>\n"},{"question":"Do DAHAI SOLAR modules and inverters carry the certifications required in Romania?","answer":"<p>Request the certificate for the exact model and application. Check the certificate holder, model coverage, standard and validity against your project requirements.<\/p>\n"},{"question":"Is there a DAHAI SOLAR project reference in Romania?","answer":"<p>Yes. A 1.1 MW rooftop PV plant was installed at a Louis Vuitton facility in Sibiu, Romania. See the Local project references section on this page.<\/p>\n"},{"question":"Is DAHAI SOLAR the same company as DAH Solar?","answer":"<p>No. DAHAI SOLAR (Dongying, Shandong, China; Romanian entity DAHAI SOLAR S.R.L.) is not related to DAH Solar. Please check the brand name and the legal entity on quotations and certificates.<\/p>\n"},{"question":"Who do I contact for technical support in Romania?","answer":"<p>Use the Contact page and include the product model, serial number, installation country and a description of the issue.<\/p>\n"},{"question":"If I export surplus solar power in Romania, how will my supplier credit me, and which charges will I still pay?","answer":"<p>Law 160\/2026, in force since 26 July 2026, changed Romania&#8217;s prosumer rules. Up to 200 kW per site, quantitative compensation applies until 31 December 2030 and is now settled monthly: grid electricity you use is billed at your contract&#8217;s active-energy price plus all legal tariffs and taxes, and every kWh you export is bought at that energy price minus the components the law excludes. So on grid consumption you still pay transmission and distribution tariffs, system services, the cogeneration contribution, green certificates, excise and VAT. Surplus delivered from 26 July 2026 is valued in money each month instead of being carried forward in kWh for 24 months. For 200\u2013400 kW, suppliers pay the monthly weighted-average day-ahead (PZU) price. ANRE&#8217;s implementing orders were still in public consultation. Checked: 8 November 2026.<\/p>\n"},{"question":"Which home battery subsidies are open in Romania right now, who can apply and how?","answer":"<p>The national scheme is the Programme for installing electricity storage systems, run by AFM under Ministry of Environment Order 1904\/2026, with a 400 million lei budget. It is open to individuals who already hold prosumer status, however their PV was financed. AFM covers up to 75% of the project value, capped at 15,000 lei including VAT, with an eligible-cost ceiling of 1,500 lei per kWh. Batteries need at least 10 kWh, 5,000 cycles, a BMS and automatic charging from PV surplus. Installers are validated 16\u201320 November 2026; individuals then apply online in the AFM application from 20 November (10:00) to 25 November 2026 (23:59). Projects are ranked by score, not first-come. A guide amendment entered consultation on 6 November; check afm.ro before applying. Checked: 8 November 2026.<\/p>\n"},{"question":"What funding is available for businesses and farms installing solar and storage in Romania (e.g. AFIR)?","answer":"<p>For farms and agri-food companies, the main scheme is AFIR&#8217;s state-aid Energy Scheme for new renewable capacity for self-consumption, funded by the Modernisation Fund. Its third session ran 15 June\u201314 August 2026 and covered solar PV with or without storage; wind was dropped. The allocation was 265 million euro (145 million for up to 1 MW, 120 million above 1 MW). Aid is 100% non-refundable, up to 650,000 euro\/MW up to 1 MW or 550,000 euro\/MW above 1 MW, within 20 million euro per beneficiary. That session is closed; AFIR published the final selection report for projects above 1 MW on 3 November 2026 and said it may open a new session if funds remain. Other companies should watch Modernisation Fund calls on energie.gov.ro. Checked: 8 November 2026.<\/p>\n"},{"question":"What tilt and orientation work best for solar panels in Romania?","answer":"<p>Using EU JRC PVGIS 5.3 (SARAH3 data 2005\u20132023, crystalline silicon, 14% system losses, free-standing fixed mounting), the optimum is roughly due south at 36\u00b0 in Bucharest (1,298 kWh per kWp per year), 38\u00b0 in Cluj-Napoca (1,217) and 35\u00b0 in Constan\u021ba (1,313). A south-facing roof at 30\u00b0 loses less than 1%. East or west faces at 10\u00b0 give about 83\u201385% of the optimum (Bucharest: 1,093 east, 1,099 west); at 30\u00b0 about 79\u201381%. An east\u2013west layout therefore yields roughly 15\u201320% less per kWp, but spreads output into morning and evening, which can raise self-consumption. Rerun PVGIS for your exact site, roof pitch and shading. Checked: 8 November 2026.<\/p>\n"},{"question":"How long does a solar system take to pay back in Romania?","answer":"<p>There is no single payback figure: it depends on your tariff, self-consumption share, system cost and any grant. A transparent method: (1) estimate annual yield for your site with EU JRC PVGIS (at optimum tilt and 14% losses, about 1,217\u20131,313 kWh per kWp in Cluj-Napoca, Bucharest and Constan\u021ba); (2) split it into self-consumed and exported kWh, ideally using hourly meter data; (3) value self-consumed kWh at your full bill price, and exported kWh at your supplier&#8217;s settlement price (up to 200 kW) or the monthly PZU average published by OPCOM (200\u2013400 kW); (4) payback = net cost after grants \u00f7 (annual savings \u2212 maintenance), allowing for panel degradation. Current supply offers are on ANRE&#8217;s comparator at posf.ro. Checked: 8 November 2026.<\/p>\n"}]},"local_faqs":[{"question":"Are DAHAI SOLAR o companie \u00een Rom\u00e2nia?","answer":"<p>Da. DAHAI SOLAR S.R.L. este \u00eenregistrat\u0103 sub nr. J2023019679407 (CUI 48970762), cu sediul social \u00een Bulevardul 22 Decembrie nr. 1, Olteni\u021ba, jude\u021bul C\u0103l\u0103ra\u0219i.<\/p>"},{"question":"Cum pot cump\u0103ra produse DAHAI SOLAR \u00een Rom\u00e2nia?","answer":"<p>Instalatorii, firmele EPC \u0219i distribuitorii pot solicita o ofert\u0103 direct de pe pagina Contact. O parte dintre produse se g\u0103sesc \u0219i la distribuitori din Rom\u00e2nia, precum SIMAI Technology \u0219i Alaska Energies. Indica\u021bi tipul de produs, cantitatea \u0219i ora\u0219ul de livrare, iar noi v\u0103 confirm\u0103m disponibilitatea \u0219i persoana de contact potrivit\u0103.<\/p>"},{"question":"Ce produse sunt disponibile pentru pia\u021ba din Rom\u00e2nia?","answer":"<p>DAHAI SOLAR are trei game: module fotovoltaice, invertoare \u0219i sisteme de stocare a energiei. Men\u021biona\u021bi \u00een cerere modelul, cantitatea \u0219i ora\u0219ul de livrare, pentru a putea confirma disponibilitatea pentru proiectul dumneavoastr\u0103.<\/p>"},{"question":"Au modulele \u0219i invertoarele DAHAI SOLAR certific\u0103rile cerute \u00een Rom\u00e2nia?","answer":"<p>Pentru invertoarele HonS3600, HonS4400, HonS5000 \u0219i HonS6000 exist\u0103 un certificat de conformitate cu cerin\u021bele de racordare la re\u021bea aplicabile \u00een Rom\u00e2nia (nr. U23-0804, EN 50549-1:2019 \/ SR EN 50549-1:2019, emis de Bureau Veritas), publicat pe pagina Certific\u0103ri. Pentru alte modele, solicita\u021bi certificatul pentru modelul \u0219i aplica\u021bia exact\u0103 \u0219i verifica\u021bi titularul, modelele acoperite, standardul \u0219i valabilitatea fa\u021b\u0103 de cerin\u021bele proiectului.<\/p>"},{"question":"Exist\u0103 un proiect de referin\u021b\u0103 DAHAI SOLAR \u00een Rom\u00e2nia?","answer":"<p>Da. O central\u0103 fotovoltaic\u0103 de 1,1 MW a fost realizat\u0103 la o unitate Louis Vuitton din Sibiu. Detaliile sunt pe pagina Proiecte.<\/p>"},{"question":"Este DAHAI SOLAR aceea\u0219i companie cu DAH Solar?","answer":"<p>Nu. DAHAI SOLAR (Dongying, provincia Shandong, China; entitatea din Rom\u00e2nia: DAHAI SOLAR S.R.L.) nu are leg\u0103tur\u0103 cu DAH Solar. Verifica\u021bi numele m\u0103rcii \u0219i entitatea juridic\u0103 pe oferte \u0219i certificate.<\/p>"},{"question":"Pe cine contactez pentru suport tehnic \u00een Rom\u00e2nia?","answer":"<p>Folosi\u021bi pagina Contact \u0219i men\u021biona\u021bi modelul produsului, num\u0103rul de serie, \u021bara instal\u0103rii \u0219i o descriere a problemei.<\/p>"},{"question":"Dac\u0103 injectez \u00een re\u021bea surplusul de energie solar\u0103, cum m\u0103 compenseaz\u0103 furnizorul \u0219i ce costuri pl\u0103tesc \u00een continuare?","answer":"<p>Legea 160\/2026, \u00een vigoare din 26 iulie 2026, a modificat regulile pentru prosumatori. Pentru locurile de consum de p\u00e2n\u0103 la 200 kW, compensarea cantitativ\u0103 se aplic\u0103 p\u00e2n\u0103 la 31 decembrie 2030 \u0219i se regularizeaz\u0103 acum lunar: energia consumat\u0103 din re\u021bea se factureaz\u0103 la pre\u021bul energiei active din contract, plus toate tarifele \u0219i taxele legale, iar fiecare kWh injectat este cump\u0103rat la acela\u0219i pre\u021b al energiei, f\u0103r\u0103 componentele excluse de lege. A\u0219adar, pentru energia consumat\u0103 din re\u021bea pl\u0103ti\u021bi \u00een continuare tarifele de transport \u0219i distribu\u021bie, serviciile de sistem, contribu\u021bia pentru cogenerare, certificatele verzi, acciza \u0219i TVA. Surplusul livrat \u00eencep\u00e2nd cu 26 iulie 2026 este valorificat lunar \u00een bani, \u00een loc s\u0103 fie reportat \u00een kWh timp de 24 de luni. Pentru 200\u2013400 kW, furnizorii pl\u0103tesc pre\u021bul mediu ponderat lunar de pe Pia\u021ba pentru Ziua Urm\u0103toare (PZU). Ordinele ANRE de aplicare erau \u00eenc\u0103 \u00een consultare public\u0103. Verificat: 8 noiembrie 2026.<\/p>"},{"question":"Ce subven\u021bii pentru baterii de acas\u0103 sunt deschise acum \u00een Rom\u00e2nia, cine poate aplica \u0219i cum?","answer":"<p>Programul na\u021bional este Programul privind instalarea sistemelor de stocare a energiei electrice, derulat de AFM \u00een baza Ordinului ministrului mediului nr. 1904\/2026, cu un buget de 400 de milioane de lei. Pot aplica persoanele fizice care au deja statut de prosumator, indiferent de modul \u00een care a fost finan\u021bat sistemul fotovoltaic. AFM acoper\u0103 p\u00e2n\u0103 la 75% din valoarea proiectului, maximum 15.000 de lei cu TVA, cu un plafon al costurilor eligibile de 1.500 de lei pe kWh. Bateriile trebuie s\u0103 aib\u0103 cel pu\u021bin 10 kWh, 5.000 de cicluri, BMS \u0219i \u00eenc\u0103rcare automat\u0103 din surplusul fotovoltaic. Instalatorii sunt valida\u021bi \u00een perioada 16\u201320 noiembrie 2026; persoanele fizice depun apoi cererea online \u00een aplica\u021bia AFM \u00eentre 20 noiembrie (ora 10:00) \u0219i 25 noiembrie 2026 (ora 23:59). Proiectele sunt ierarhizate dup\u0103 punctaj, nu \u00een ordinea depunerii. O modificare a ghidului a intrat \u00een consultare pe 6 noiembrie; verifica\u021bi afm.ro \u00eenainte de a aplica. Verificat: 8 noiembrie 2026.<\/p>"},{"question":"Ce finan\u021b\u0103ri exist\u0103 pentru firmele \u0219i fermele care instaleaz\u0103 panouri solare \u0219i stocare \u00een Rom\u00e2nia (de exemplu, AFIR)?","answer":"<p>Pentru ferme \u0219i firmele din industria agroalimentar\u0103, principala schem\u0103 este schema de ajutor de stat a AFIR pentru noi capacit\u0103\u021bi de producere a energiei din surse regenerabile pentru autoconsum, finan\u021bat\u0103 din Fondul pentru Modernizare. A treia sesiune s-a desf\u0103\u0219urat \u00een perioada 15 iunie\u201314 august 2026 \u0219i a acoperit sisteme fotovoltaice, cu sau f\u0103r\u0103 stocare; energia eolian\u0103 nu a mai fost inclus\u0103. Alocarea a fost de 265 de milioane de euro (145 de milioane pentru proiecte de p\u00e2n\u0103 la 1 MW \u0219i 120 de milioane peste 1 MW). Ajutorul este 100% nerambursabil: p\u00e2n\u0103 la 650.000 de euro\/MW pentru proiecte de p\u00e2n\u0103 la 1 MW sau 550.000 de euro\/MW peste 1 MW, \u00een limita a 20 de milioane de euro per beneficiar. Sesiunea s-a \u00eencheiat; AFIR a publicat pe 3 noiembrie 2026 raportul final de selec\u021bie pentru proiectele de peste 1 MW \u0219i a anun\u021bat c\u0103 poate deschide o nou\u0103 sesiune dac\u0103 r\u0103m\u00e2n fonduri. Celelalte firme pot urm\u0103ri apelurile Fondului pentru Modernizare pe energie.gov.ro. Verificat: 8 noiembrie 2026.<\/p>"},{"question":"Ce \u00eenclinare \u0219i orientare sunt optime pentru panourile solare \u00een Rom\u00e2nia?","answer":"<p>Conform EU JRC PVGIS 5.3 (date SARAH3 2005\u20132023, siliciu cristalin, pierderi de sistem de 14%, montaj fix independent), optimul este aproximativ orientarea sud, la 36\u00b0 \u00een Bucure\u0219ti (1.298 kWh pe kWp pe an), 38\u00b0 \u00een Cluj-Napoca (1.217) \u0219i 35\u00b0 \u00een Constan\u021ba (1.313). Un acoperi\u0219 orientat spre sud, \u00eenclinat la 30\u00b0, pierde sub 1%. Suprafe\u021bele orientate est sau vest, la 10\u00b0, produc circa 83\u201385% din optim (Bucure\u0219ti: 1.093 est, 1.099 vest); la 30\u00b0, circa 79\u201381%. Un sistem est\u2013vest produce deci cu aproximativ 15\u201320% mai pu\u021bin pe kWp, dar distribuie produc\u021bia spre diminea\u021b\u0103 \u0219i sear\u0103, ceea ce poate cre\u0219te autoconsumul. Rula\u021bi PVGIS pentru amplasamentul, \u00eenclinarea acoperi\u0219ului \u0219i umbrirea exacte. Verificat: 8 noiembrie 2026.<\/p>"},{"question":"\u00cen c\u00e2t timp se amortizeaz\u0103 un sistem solar \u00een Rom\u00e2nia?","answer":"<p>Nu exist\u0103 o perioad\u0103 de amortizare unic\u0103: depinde de tarif, de ponderea autoconsumului, de costul sistemului \u0219i de eventualele granturi. O metod\u0103 transparent\u0103: (1) estima\u021bi produc\u021bia anual\u0103 pentru amplasamentul dumneavoastr\u0103 cu EU JRC PVGIS (la \u00eenclinarea optim\u0103 \u0219i 14% pierderi, circa 1.217\u20131.313 kWh pe kWp \u00een Cluj-Napoca, Bucure\u0219ti \u0219i Constan\u021ba); (2) \u00eemp\u0103r\u021bi\u021bi-o \u00een kWh autoconsuma\u021bi \u0219i kWh injecta\u021bi, ideal pe baza datelor orare ale contorului; (3) evalua\u021bi kWh autoconsuma\u021bi la pre\u021bul integral din factur\u0103, iar kWh injecta\u021bi la pre\u021bul de regularizare al furnizorului (p\u00e2n\u0103 la 200 kW) sau la media lunar\u0103 PZU publicat\u0103 de OPCOM (200\u2013400 kW); (4) perioada de amortizare = costul net dup\u0103 granturi \u00f7 (economiile anuale \u2212 mentenan\u021ba), \u021bin\u00e2nd cont de degradarea panourilor. Ofertele actuale de furnizare se g\u0103sesc \u00een comparatorul ANRE de pe posf.ro. Verificat: 8 noiembrie 2026.<\/p>"}],"local_faqs_source":{"label":"FAQ in the local language (country site)","type":"repeater","formatted_value":[{"question":"Are DAHAI SOLAR o companie \u00een Rom\u00e2nia?","answer":"<p>Da. DAHAI SOLAR S.R.L. este \u00eenregistrat\u0103 sub nr. J2023019679407 (CUI 48970762), cu sediul social \u00een Bulevardul 22 Decembrie nr. 1, Olteni\u021ba, jude\u021bul C\u0103l\u0103ra\u0219i.<\/p>\n"},{"question":"Cum pot cump\u0103ra produse DAHAI SOLAR \u00een Rom\u00e2nia?","answer":"<p>Instalatorii, firmele EPC \u0219i distribuitorii pot solicita o ofert\u0103 direct de pe pagina Contact. O parte dintre produse se g\u0103sesc \u0219i la distribuitori din Rom\u00e2nia, precum SIMAI Technology \u0219i Alaska Energies. Indica\u021bi tipul de produs, cantitatea \u0219i ora\u0219ul de livrare, iar noi v\u0103 confirm\u0103m disponibilitatea \u0219i persoana de contact potrivit\u0103.<\/p>\n"},{"question":"Ce produse sunt disponibile pentru pia\u021ba din Rom\u00e2nia?","answer":"<p>DAHAI SOLAR are trei game: module fotovoltaice, invertoare \u0219i sisteme de stocare a energiei. Men\u021biona\u021bi \u00een cerere modelul, cantitatea \u0219i ora\u0219ul de livrare, pentru a putea confirma disponibilitatea pentru proiectul dumneavoastr\u0103.<\/p>\n"},{"question":"Au modulele \u0219i invertoarele DAHAI SOLAR certific\u0103rile cerute \u00een Rom\u00e2nia?","answer":"<p>Pentru invertoarele HonS3600, HonS4400, HonS5000 \u0219i HonS6000 exist\u0103 un certificat de conformitate cu cerin\u021bele de racordare la re\u021bea aplicabile \u00een Rom\u00e2nia (nr. U23-0804, EN 50549-1:2019 \/ SR EN 50549-1:2019, emis de Bureau Veritas), publicat pe pagina Certific\u0103ri. Pentru alte modele, solicita\u021bi certificatul pentru modelul \u0219i aplica\u021bia exact\u0103 \u0219i verifica\u021bi titularul, modelele acoperite, standardul \u0219i valabilitatea fa\u021b\u0103 de cerin\u021bele proiectului.<\/p>\n"},{"question":"Exist\u0103 un proiect de referin\u021b\u0103 DAHAI SOLAR \u00een Rom\u00e2nia?","answer":"<p>Da. O central\u0103 fotovoltaic\u0103 de 1,1 MW a fost realizat\u0103 la o unitate Louis Vuitton din Sibiu. Detaliile sunt pe pagina Proiecte.<\/p>\n"},{"question":"Este DAHAI SOLAR aceea\u0219i companie cu DAH Solar?","answer":"<p>Nu. DAHAI SOLAR (Dongying, provincia Shandong, China; entitatea din Rom\u00e2nia: DAHAI SOLAR S.R.L.) nu are leg\u0103tur\u0103 cu DAH Solar. Verifica\u021bi numele m\u0103rcii \u0219i entitatea juridic\u0103 pe oferte \u0219i certificate.<\/p>\n"},{"question":"Pe cine contactez pentru suport tehnic \u00een Rom\u00e2nia?","answer":"<p>Folosi\u021bi pagina Contact \u0219i men\u021biona\u021bi modelul produsului, num\u0103rul de serie, \u021bara instal\u0103rii \u0219i o descriere a problemei.<\/p>\n"},{"question":"Dac\u0103 injectez \u00een re\u021bea surplusul de energie solar\u0103, cum m\u0103 compenseaz\u0103 furnizorul \u0219i ce costuri pl\u0103tesc \u00een continuare?","answer":"<p>Legea 160\/2026, \u00een vigoare din 26 iulie 2026, a modificat regulile pentru prosumatori. Pentru locurile de consum de p\u00e2n\u0103 la 200 kW, compensarea cantitativ\u0103 se aplic\u0103 p\u00e2n\u0103 la 31 decembrie 2030 \u0219i se regularizeaz\u0103 acum lunar: energia consumat\u0103 din re\u021bea se factureaz\u0103 la pre\u021bul energiei active din contract, plus toate tarifele \u0219i taxele legale, iar fiecare kWh injectat este cump\u0103rat la acela\u0219i pre\u021b al energiei, f\u0103r\u0103 componentele excluse de lege. A\u0219adar, pentru energia consumat\u0103 din re\u021bea pl\u0103ti\u021bi \u00een continuare tarifele de transport \u0219i distribu\u021bie, serviciile de sistem, contribu\u021bia pentru cogenerare, certificatele verzi, acciza \u0219i TVA. Surplusul livrat \u00eencep\u00e2nd cu 26 iulie 2026 este valorificat lunar \u00een bani, \u00een loc s\u0103 fie reportat \u00een kWh timp de 24 de luni. Pentru 200\u2013400 kW, furnizorii pl\u0103tesc pre\u021bul mediu ponderat lunar de pe Pia\u021ba pentru Ziua Urm\u0103toare (PZU). Ordinele ANRE de aplicare erau \u00eenc\u0103 \u00een consultare public\u0103. Verificat: 8 noiembrie 2026.<\/p>\n"},{"question":"Ce subven\u021bii pentru baterii de acas\u0103 sunt deschise acum \u00een Rom\u00e2nia, cine poate aplica \u0219i cum?","answer":"<p>Programul na\u021bional este Programul privind instalarea sistemelor de stocare a energiei electrice, derulat de AFM \u00een baza Ordinului ministrului mediului nr. 1904\/2026, cu un buget de 400 de milioane de lei. Pot aplica persoanele fizice care au deja statut de prosumator, indiferent de modul \u00een care a fost finan\u021bat sistemul fotovoltaic. AFM acoper\u0103 p\u00e2n\u0103 la 75% din valoarea proiectului, maximum 15.000 de lei cu TVA, cu un plafon al costurilor eligibile de 1.500 de lei pe kWh. Bateriile trebuie s\u0103 aib\u0103 cel pu\u021bin 10 kWh, 5.000 de cicluri, BMS \u0219i \u00eenc\u0103rcare automat\u0103 din surplusul fotovoltaic. Instalatorii sunt valida\u021bi \u00een perioada 16\u201320 noiembrie 2026; persoanele fizice depun apoi cererea online \u00een aplica\u021bia AFM \u00eentre 20 noiembrie (ora 10:00) \u0219i 25 noiembrie 2026 (ora 23:59). Proiectele sunt ierarhizate dup\u0103 punctaj, nu \u00een ordinea depunerii. O modificare a ghidului a intrat \u00een consultare pe 6 noiembrie; verifica\u021bi afm.ro \u00eenainte de a aplica. Verificat: 8 noiembrie 2026.<\/p>\n"},{"question":"Ce finan\u021b\u0103ri exist\u0103 pentru firmele \u0219i fermele care instaleaz\u0103 panouri solare \u0219i stocare \u00een Rom\u00e2nia (de exemplu, AFIR)?","answer":"<p>Pentru ferme \u0219i firmele din industria agroalimentar\u0103, principala schem\u0103 este schema de ajutor de stat a AFIR pentru noi capacit\u0103\u021bi de producere a energiei din surse regenerabile pentru autoconsum, finan\u021bat\u0103 din Fondul pentru Modernizare. A treia sesiune s-a desf\u0103\u0219urat \u00een perioada 15 iunie\u201314 august 2026 \u0219i a acoperit sisteme fotovoltaice, cu sau f\u0103r\u0103 stocare; energia eolian\u0103 nu a mai fost inclus\u0103. Alocarea a fost de 265 de milioane de euro (145 de milioane pentru proiecte de p\u00e2n\u0103 la 1 MW \u0219i 120 de milioane peste 1 MW). Ajutorul este 100% nerambursabil: p\u00e2n\u0103 la 650.000 de euro\/MW pentru proiecte de p\u00e2n\u0103 la 1 MW sau 550.000 de euro\/MW peste 1 MW, \u00een limita a 20 de milioane de euro per beneficiar. Sesiunea s-a \u00eencheiat; AFIR a publicat pe 3 noiembrie 2026 raportul final de selec\u021bie pentru proiectele de peste 1 MW \u0219i a anun\u021bat c\u0103 poate deschide o nou\u0103 sesiune dac\u0103 r\u0103m\u00e2n fonduri. Celelalte firme pot urm\u0103ri apelurile Fondului pentru Modernizare pe energie.gov.ro. Verificat: 8 noiembrie 2026.<\/p>\n"},{"question":"Ce \u00eenclinare \u0219i orientare sunt optime pentru panourile solare \u00een Rom\u00e2nia?","answer":"<p>Conform EU JRC PVGIS 5.3 (date SARAH3 2005\u20132023, siliciu cristalin, pierderi de sistem de 14%, montaj fix independent), optimul este aproximativ orientarea sud, la 36\u00b0 \u00een Bucure\u0219ti (1.298 kWh pe kWp pe an), 38\u00b0 \u00een Cluj-Napoca (1.217) \u0219i 35\u00b0 \u00een Constan\u021ba (1.313). Un acoperi\u0219 orientat spre sud, \u00eenclinat la 30\u00b0, pierde sub 1%. Suprafe\u021bele orientate est sau vest, la 10\u00b0, produc circa 83\u201385% din optim (Bucure\u0219ti: 1.093 est, 1.099 vest); la 30\u00b0, circa 79\u201381%. Un sistem est\u2013vest produce deci cu aproximativ 15\u201320% mai pu\u021bin pe kWp, dar distribuie produc\u021bia spre diminea\u021b\u0103 \u0219i sear\u0103, ceea ce poate cre\u0219te autoconsumul. Rula\u021bi PVGIS pentru amplasamentul, \u00eenclinarea acoperi\u0219ului \u0219i umbrirea exacte. Verificat: 8 noiembrie 2026.<\/p>\n"},{"question":"\u00cen c\u00e2t timp se amortizeaz\u0103 un sistem solar \u00een Rom\u00e2nia?","answer":"<p>Nu exist\u0103 o perioad\u0103 de amortizare unic\u0103: depinde de tarif, de ponderea autoconsumului, de costul sistemului \u0219i de eventualele granturi. O metod\u0103 transparent\u0103: (1) estima\u021bi produc\u021bia anual\u0103 pentru amplasamentul dumneavoastr\u0103 cu EU JRC PVGIS (la \u00eenclinarea optim\u0103 \u0219i 14% pierderi, circa 1.217\u20131.313 kWh pe kWp \u00een Cluj-Napoca, Bucure\u0219ti \u0219i Constan\u021ba); (2) \u00eemp\u0103r\u021bi\u021bi-o \u00een kWh autoconsuma\u021bi \u0219i kWh injecta\u021bi, ideal pe baza datelor orare ale contorului; (3) evalua\u021bi kWh autoconsuma\u021bi la pre\u021bul integral din factur\u0103, iar kWh injecta\u021bi la pre\u021bul de regularizare al furnizorului (p\u00e2n\u0103 la 200 kW) sau la media lunar\u0103 PZU publicat\u0103 de OPCOM (200\u2013400 kW); (4) perioada de amortizare = costul net dup\u0103 granturi \u00f7 (economiile anuale \u2212 mentenan\u021ba), \u021bin\u00e2nd cont de degradarea panourilor. Ofertele actuale de furnizare se g\u0103sesc \u00een comparatorul ANRE de pe posf.ro. Verificat: 8 noiembrie 2026.<\/p>\n"}]}},"_links":{"self":[{"href":"https:\/\/dahaisolar.com\/ro\/wp-json\/wp\/v2\/market\/11849","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/dahaisolar.com\/ro\/wp-json\/wp\/v2\/market"}],"about":[{"href":"https:\/\/dahaisolar.com\/ro\/wp-json\/wp\/v2\/types\/market"}],"version-history":[{"count":1,"href":"https:\/\/dahaisolar.com\/ro\/wp-json\/wp\/v2\/market\/11849\/revisions"}],"predecessor-version":[{"id":11946,"href":"https:\/\/dahaisolar.com\/ro\/wp-json\/wp\/v2\/market\/11849\/revisions\/11946"}],"acf:post":[{"embeddable":true,"href":"https:\/\/dahaisolar.com\/ro\/wp-json\/wp\/v2\/document\/11931"}],"wp:attachment":[{"href":"https:\/\/dahaisolar.com\/ro\/wp-json\/wp\/v2\/media?parent=11849"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}